Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. 3. Calculating the cost impact of different bonus structures
    1. Analysis of the bonus to be paid per metric : With the 3rd sheet called “Analysis”, you can know how much bonus you will pay on each metric (in the currency used in the NGU)


    2. links related to Excel file and SQL query to be used in case needed respectively : 
      1. Excel file
      2. SQL Query Query:
        1. Rwanda
        2. Kenya
        3. BDRC
        4. Togo